
根據國家及(ji)山東(dong)省、青(qing)島(dao)市相關法律法規,青(qing)島(dao)西(xi)海岸經(jing)濟新區城(cheng)際軌道交(jiao)通(tong)項目(R3線)環(huan)境影響評(ping)價在青(qing)島(dao)市環(huan)境保護(hu)局(ju)官方網(wang)站進行公示(shi)。
青島西海岸城際軌道交(jiao)通項目(mu)(R3線(xian)(xian)(xian))位于青島市西海岸經濟新(xin)區(qu),線(xian)(xian)(xian)路(lu)止(zhi)于開發區(qu)的嘉(jia)陵江路(lu)站(zhan)(zhan)(zhan)(zhan),終于董(dong)家口(kou)火(huo)車站(zhan)(zhan)(zhan)(zhan)。正線(xian)(xian)(xian)全長(chang)70.15km,其中地(di)(di)下線(xian)(xian)(xian) 18.25km,高(gao)架(jia)線(xian)(xian)(xian)47.95km,地(di)(di)面線(xian)(xian)(xian)3.95km(含敞口(kou)段(duan)0.3km)。設(she)(she)車站(zhan)(zhan)(zhan)(zhan)20座(zuo),其中地(di)(di)下站(zhan)(zhan)(zhan)(zhan)7座(zuo),高(gao)架(jia)站(zhan)(zhan)(zhan)(zhan)13座(zuo),全線(xian)(xian)(xian)設(she)(she)一段(duan)兩場,分別 為(wei)教(jiao)育中心車輛(liang)段(duan)與綜合基地(di)(di)、靈山(shan)衛停車場和董(dong)家口(kou)停車場。全線(xian)(xian)(xian)采用4輛(liang)編組,最高(gao)行車速度120km/h。全線(xian)(xian)(xian)分期建設(she)(she),一期起(qi)點(dian)為(wei)井岡山(shan)路(lu)站(zhan)(zhan)(zhan)(zhan),終點(dian)為(wei) 教(jiao)育中心站(zhan)(zhan)(zhan)(zhan)。
市民可在10個工作日內,按照公示信(xin)息提供的聯系方(fang)式,通過發送電子郵件、傳真(zhen)、信(xin)函(han)等方(fang)式發表(biao)關于該項目環評工作的意見看法。
聯系人:青島地鐵(tie)集團(tuan)有限公司 袁先生
聯系電話:0532-67708593
- 青島市地鐵規劃設計院有限公司 2021年第二次社會招聘公告 2022-05-24
- 青島市地鐵規劃設計院有限公司 2021年第一次社會招聘公告 2022-02-25
- 戰“疫”復工在行動益群公司進一步完善地鐵大廈疫情防控措施 2021-03-09
- 青島地鐵集團成功舉辦 2號線車輛基地高壓觸電事故應急演練 2017-01-27
- 青島地鐵工程建設安全質量隱患排查系統正式上線試運行 2017-01-27